黑料网

ISSN 2472-0518

Oil & Gas Research
黑料网

Our Group organises 3000+ Global Events every year across USA, Europe & Asia with support from 1000 more scientific Societies and Publishes 700+ 黑料网 Journals which contains over 50000 eminent personalities, reputed scientists as editorial board members.

黑料网 Journals gaining more Readers and Citations
700 Journals and 15,000,000 Readers Each Journal is getting 25,000+ Readers

This Readership is 10 times more when compared to other Subscription Journals (Source: Google Analytics)
  • Research Article   
  • Oil Gas Res 2022, Vol 8(1): 219
  • DOI: 10.4172/2472-0518.1000219

Synthesis and Characterization of a New Solution to Remove Plugging During Water Flooding: Study Case, Platform B of Bohai Oilfield.

Moussa Z. Salim1,2,3*, Kang Wanli1,2, Hongbin Yang1,2, Chao Chen1,2, Xiaoyu Hou1,2, K. Shola1,2, Yuxi Li3 and Ming Lu3
1Key Laboratory of Unconventional Oil & Gas Development (China University of Petroleum), Qingdao 266580, China
2School of Petroleum Engineering, China University of Petroleum (East China), Qingdao 266580, PR China
3Shandong Ginzre New Material Development Co. Ltd., Jinan, 271100, PR China
*Corresponding Author : Moussa Z. Salim, Shandong GINZRE New Material Development Co. Ltd., Jinan, 271100, PR China, Tel: +8615726269250, Email: bmsalim90@gmail.com, minglu@live.cn

Received Date: Jan 01, 2022 / Published Date: Jan 29, 2022

Abstract

Formation plugging has occurred during water flooding process on B platform of Bohai oilfield, leading to an increase of injection pressures as well as the injected water volume due to the reduction in water layer adsorption within the formation. To overcome these issues, the present work intend to investigate the causes of such plugging, analyze the plugging sample, develop a new removal formula composed of surfactants and weak acids with ability of dissolving the plug, then characterize the solution and test its performances. SEM and XRD analysis were used to characterize structure and composition in elements of the plugging scale; the new developed removal solution did not contain strong acids, as they have been proved hazardous during the unplugging process for injection system. The new solution was found to dissolve up to 72% of the plug, with 2.12% corrosion rate. The solution was compatible with formation and injected waters, decreased the injection pressure system by 0.426MPa within 3PV of injection volume in a sand pack flooding experiment and has an acceptable pH of 5.8. A suitable removal solution for the plugging problems that the oilfield is facing.

Citation: Moussa Z. Salim, Kang Wanli, Hongbin Yang, Chao Chen, Xiaoyu Hou, Yuxi Li , K. Shola and Ming Lu (2021) Synthesis and Characterization of a New Solution to Remove Plugging During Water Flooding: Study Case, Platform B of Bohai Oilfield.. Oil Gas Res 8:. Doi: 10.4172/2472-0518.1000219

Copyright: © 2022 Salim M.Z. This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

International Conferences 2024-25
 
Meet Inspiring Speakers and Experts at our 3000+ Global

Conferences by Country

Medical & Clinical Conferences

Conferences By Subject

Top